Free checklist · Drywall

Drywall inspection checklist: hang and finish

Use this checklist twice: after hang, before tape, and again after finish. At hang it checks board type, fastener spacing and fire-rated assemblies. At finish it checks the level of finish, seams and fasteners under light, straight corners, and that the walls are ready for paint.

Use it free on your phone
Free checklist from SRENE.io · myBivy for Trades

Drywall hang & finish

After hang (before tape) and after finish.

JobArea / floorDateChecked by
HangPASSFAILN/A
Correct board type (Type X, moisture resistant)
Fastener spacing
Fire-rated assemblies per listing
Firesafing / caulking at rated walls
FinishPASSFAILN/A
Level of finish per spec
No visible seams / fasteners under light
Corners straight
Ready for paint
Notes
Drywall (QC)NameSignatureDate
GCNameSignatureDate

Run this checklist free on your phone, with photos and signatures: myBivy for Trades at srene.io. A field checklist, not the code; follow the code and amendments your jurisdiction has adopted.

What gets missed most

  • The wrong board in a rated or wet location.
  • Fire-rated walls not sealed at penetrations.
  • Seams that show under raking light.
  • A finish level lower than the spec calls for.

This is a field checklist, not the code. Your inspector enforces the code and local amendments your jurisdiction has adopted.

Questions trades ask

What is a drywall level of finish?

A scale, usually Level 0 to Level 5, describing how much taping and finishing is done. Higher levels are for smooth walls and critical lighting. Use the level your spec calls for.

When is drywall inspected?

Many jurisdictions inspect the fastening before taping, especially on fire-rated assemblies. Check with your building department.

What board goes in a fire-rated wall?

Whatever the rated assembly's listing calls for, often Type X. Follow the listing exactly.

Can I use this checklist on my phone?

Yes. It's built into myBivy for Trades, free for up to 5 people: Pass, Fail or N/A on each item, notes, photos and readings, signatures on site, and a clean PDF for the GC.

Free for trade contractors

Pass the first inspection.

This checklist is built into myBivy for Trades: Pass, Fail or N/A on every item, notes, photos and readings, the GC signs on site, and a clean PDF goes out the same day. Free for up to 5 people.

The inspection checklist app · All free trade checklists · Free field forms