Use this checklist twice: after hang, before tape, and again after finish. At hang it checks board type, fastener spacing and fire-rated assemblies. At finish it checks the level of finish, seams and fasteners under light, straight corners, and that the walls are ready for paint.
After hang (before tape) and after finish.
| Hang | PASS | FAIL | N/A |
|---|---|---|---|
| Correct board type (Type X, moisture resistant) | |||
| Fastener spacing | |||
| Fire-rated assemblies per listing | |||
| Firesafing / caulking at rated walls |
| Finish | PASS | FAIL | N/A |
|---|---|---|---|
| Level of finish per spec | |||
| No visible seams / fasteners under light | |||
| Corners straight | |||
| Ready for paint |
Run this checklist free on your phone, with photos and signatures: myBivy for Trades at srene.io. A field checklist, not the code; follow the code and amendments your jurisdiction has adopted.
This is a field checklist, not the code. Your inspector enforces the code and local amendments your jurisdiction has adopted.
A scale, usually Level 0 to Level 5, describing how much taping and finishing is done. Higher levels are for smooth walls and critical lighting. Use the level your spec calls for.
Many jurisdictions inspect the fastening before taping, especially on fire-rated assemblies. Check with your building department.
Whatever the rated assembly's listing calls for, often Type X. Follow the listing exactly.
Yes. It's built into myBivy for Trades, free for up to 5 people: Pass, Fail or N/A on each item, notes, photos and readings, signatures on site, and a clean PDF for the GC.
This checklist is built into myBivy for Trades: Pass, Fail or N/A on every item, notes, photos and readings, the GC signs on site, and a clean PDF goes out the same day. Free for up to 5 people.
The inspection checklist app · All free trade checklists · Free field forms