Free checklist · HVAC

HVAC rough-in inspection checklist

An HVAC rough-in inspection checks ductwork, refrigerant piping and controls before they're covered. This checklist covers duct supports, sealing, insulation and fire dampers, refrigerant lines, condensate drains, control wiring and thermostat locations, plus the nitrogen pressure test and how long it held.

Use it free on your phone
Free checklist from SRENE.io · myBivy for Trades

HVAC rough-in

Ductwork, piping and controls before cover.

JobArea / floorDateChecked by
DuctworkPASSFAILN/A
Sleeves and penetrations
Elevation / pitch, location and alignment
Supports and anchors
Fire dampers installed and accessible
Joints sealed (mastic / tape)
Ductwork insulated where required
Piping & controlsPASSFAILN/A
Refrigerant lines supported and insulated
Condensate drain sloped, trapped
Control conduit and wiring routed
Thermostat locations per plans
TestsPASSFAILN/A
Nitrogen pressure test psi
Held for minutes
Equipment check-out
Notes
HVAC tech (QC)NameSignatureDate
GCNameSignatureDate
Mechanical inspectorNameSignatureDate

Run this checklist free on your phone, with photos and signatures: myBivy for Trades at srene.io. A field checklist, not the code; follow the code and amendments your jurisdiction has adopted.

What gets missed most

  • Duct joints that aren't sealed.
  • Fire dampers installed where nobody can reach them.
  • A condensate drain without slope or a trap.
  • Refrigerant lines not insulated or supported.

This is a field checklist, not the code. Your inspector enforces the code and local amendments your jurisdiction has adopted.

Questions trades ask

What's checked at an HVAC rough-in inspection?

Ductwork and its supports, sealing, insulation and fire dampers; refrigerant and condensate piping; control wiring; thermostat locations; and the pressure test.

Why pressure test refrigerant lines with nitrogen?

A nitrogen test proves the line set is tight before refrigerant goes in. Record the pressure and how long it held.

Who signs off on the HVAC rough-in?

On this checklist: the HVAC tech's QC check, the GC and the mechanical inspector.

Can I use this checklist on my phone?

Yes. It's built into myBivy for Trades, free for up to 5 people: Pass, Fail or N/A on each item, notes, photos and readings, signatures on site, and a clean PDF for the GC.

Free for trade contractors

Pass the first inspection.

This checklist is built into myBivy for Trades: Pass, Fail or N/A on every item, notes, photos and readings, the GC signs on site, and a clean PDF goes out the same day. Free for up to 5 people.

The inspection checklist app · All free trade checklists · Free field forms