A full rough-in inspection checks every trade's work before walls and ceilings close: framing and drywall prep, electrical, plumbing, HVAC controls, mechanical piping, ductwork, insulation and fire protection. This checklist puts all of it on one form, with sign-offs for QC and each inspector.
The full rough-in inspection: drywall/framing, electrical, plumbing, HVAC controls, mechanical, ductwork, insulation, fire protection.
| Drywall: walls | PASS | FAIL | N/A |
|---|---|---|---|
| Studs: size / gauge | |||
| Studs: condition | |||
| Studs: plumbness | |||
| Studs: layout | |||
| Insulation | |||
| Fasteners: screws / PAFs / quantity |
| Drywall: ceilings | PASS | FAIL | N/A |
|---|---|---|---|
| Hangers: type / size / spacing | |||
| Structural supports | |||
| Track: type / size | |||
| Track: layout | |||
| Fireproofing | |||
| Firesafing / caulking |
| Electrical | PASS | FAIL | N/A |
|---|---|---|---|
| Conduit: sleeves / penetrations | |||
| Conduit: connections / mounting / routing | |||
| Firesafing / caulking | |||
| Identification | |||
| Code compliance |
| Plumbing | PASS | FAIL | N/A |
|---|---|---|---|
| Piping: sleeves / penetrations | |||
| Piping: elevation / pitch / location / alignment | |||
| Piping: supports / anchors | |||
| Firesafing / caulking | |||
| Equipment check-out | |||
| Identification | |||
| Tested |
| HVAC controls | PASS | FAIL | N/A |
|---|---|---|---|
| Conduit: sleeves / penetrations | |||
| Conduit: connections / mounting / routing | |||
| Firesafing / caulking | |||
| Identification | |||
| Code compliance |
| Mechanical | PASS | FAIL | N/A |
|---|---|---|---|
| Piping: sleeves / penetrations | |||
| Piping: elevation / pitch / location / alignment | |||
| Piping: supports / anchors | |||
| Caulked / firesafing | |||
| Equipment check-out | |||
| Identification | |||
| Tested |
| Ductwork | PASS | FAIL | N/A |
|---|---|---|---|
| Sleeves / penetrations | |||
| Elevation / pitch | |||
| Location / alignment | |||
| Supports / anchors | |||
| Fire dampers | |||
| Caulked / fire safed | |||
| Equipment check-out | |||
| Tested |
| Insulation | PASS | FAIL | N/A |
|---|---|---|---|
| Piping | |||
| Ductwork |
| Fire protection | PASS | FAIL | N/A |
|---|---|---|---|
| Piping: sleeves / penetrations | |||
| Piping: elevation / pitch / location / alignment | |||
| Piping: supports / anchors | |||
| Caulked / firesafing | |||
| Equipment check-out | |||
| Insulation | |||
| Tested |
Run this checklist free on your phone, with photos and signatures: myBivy for Trades at srene.io. A field checklist, not the code; follow the code and amendments your jurisdiction has adopted.
This is a field checklist, not the code. Your inspector enforces the code and local amendments your jurisdiction has adopted.
The inspection of electrical, plumbing, mechanical and framing work before it's covered. Each trade's inspector signs off before insulation and drywall.
Usually the GC's superintendent or QC rep, walking every trade before calling for inspections so each trade fixes its items first.
Sealing penetrations in fire-rated walls and floors with listed materials so fire and smoke can't pass through.
Yes. It's built into myBivy for Trades, free for up to 5 people: Pass, Fail or N/A on each item, notes, photos and readings, signatures on site, and a clean PDF for the GC.