Plumbing rough-in and top-out inspection checklist

A plumbing rough-in (or top-out) inspection checks supply, drain, waste and vent piping before walls are covered, along with the pressure tests. This checklist covers the piping, DWV slope, vents, cleanouts and trap arms, the water and DWV test readings and how long they held, and stub-outs and valve labels.

Use it free on your phone
Free checklist from SRENE.io · myBivy for Trades

Plumbing rough-in / top-out

Supply, drain, waste and vent before cover, with the pressure test.

JobArea / floorDateChecked by
PipingPASSFAILN/A
Sleeves and penetrations
Elevation, pitch, location and alignment
Supports and anchors
Nail plates where required
Firestopping / caulking
DWVPASSFAILN/A
Drain slope (1/4 in. per ft typical)
Vents sized and terminated per code
Cleanouts accessible
Trap arms within limits
TestsPASSFAILN/A
Water test pressure psi
Held for minutes
DWV test head / air psi or ft
No leaks observed
IdentificationPASSFAILN/A
Stub-outs capped and protected
Valves / shutoffs labeled
Equipment check-out
Notes
Plumber (QC)NameSignatureDate
GCNameSignatureDate
Plumbing inspectorNameSignatureDate

Run this checklist free on your phone, with photos and signatures: myBivy for Trades at srene.io. A field checklist, not the code; follow the code and amendments your jurisdiction has adopted.

What gets missed most

  • Drain lines without enough slope.
  • Cleanouts that won't be reachable once the walls close.
  • Missing nail plates where pipe runs near the face of a stud.
  • A test that wasn't held long enough, or wasn't written down.

This is a field checklist, not the code. Your inspector enforces the code and local amendments your jurisdiction has adopted.

Questions trades ask

What is plumbing top-out?

The stage when supply and DWV piping is roughed in through the walls and up through the roof, before insulation and drywall. Many inspectors call the inspection rough-in or top-out.

What pressure test does a plumbing rough-in need?

It depends on your local code and the piping: commonly a water or air test on the supply lines and a water or air test on the DWV. Record the pressure and how long it held.

What slope should a drain have?

1/4 inch per foot is typical for smaller drains and is this checklist's reference, but the required slope depends on pipe size and your adopted code.

Can I use this checklist on my phone?

Yes. It's built into myBivy for Trades, free for up to 5 people: Pass, Fail or N/A on each item, notes, photos and readings, signatures on site, and a clean PDF for the GC.

Free for trade contractors

Pass the first inspection.

This checklist is built into myBivy for Trades: Pass, Fail or N/A on every item, notes, photos and readings, the GC signs on site, and a clean PDF goes out the same day. Free for up to 5 people.

The inspection checklist app · All free trade checklists · Free field forms